In order of completion:
Sea Tide Socks: don't fit properly, and while I love the yarn, I hate the heel and how they fit. Also, I cast off too tightly on one, so I have to work at it to make it onto my foot. I need to find someone with long fat feet and skinny ankles. I don't think this person exists. So... I guess these will just kinda hang out. Unless I decide to frog them entirely, which might happen, but is unlikely.
 |
Fuzzy photo taking for the win! |
Sweater update: am currently on skeins 2 and 3, and a little over half way through the first repeat of the main cable. I might not need to do a full 3rd repeat, but we're not sure at the moment. Also, the sleeves and armholes? Still haven't worked that out. I need to go the library and get some books.
I bought skeins 4-6 yesterday, completely emptying their stock. And I need at least 10 more skeins I think. The original pattern calls for about 1400 yards, at 217 yards/ skein= 7 skeins. Double that since I have to hold the yarn double= 14. Plus some extra because J is huge. So I guess I'll have to do a special order. Which is going to have to wait a paycheck, at least.
 |
Pencil for scale again |
Pirate Hat: someone gag me with a spoon. It looks like a mini-skirt. The pattern is overly fussy (yes, I realize the stupidity of the cosplay sweater being less of a pain than the soon to be felted hat). Starting from the outside and working in may be the more logical way of doing this so it felts properly, but the decreases seem to be placed randomly and I'm currently at that awkward place where it's too small for the circular but too big for the dpns. Also, that's not counting the pain finding size 13 dpns was. And that's just borrowing them. For a while, I was thinking I was going to need to sharpen a frickin dowel rod.
Currently, this is on hold while I find the other ball of yarn that got moved somewhere over the weekend. I currently don't even have enough to finish the row I'm now. I'm pretty sure I saw it this morning, or at least the bag it should be in, but I was in a hurry and didn't have time to check. I should be able to at least finish the knitting part of it this weekend, but probably not the felting. I should probably go look up good instructions on how to felt. Hrm.
Birthing Socks: These were originally supposed to be for me, in their toe and heel-less glory. But those stupid stirrups at the dr's office get really cold. And in summer, with it already being freezing inside due to the A/C? Screw that noise. So these are now for Baby SH's mom. Hopefully, she'll get more use out of them than just birthing, but, whatever.
Currently, there is no progress to speak of on these as I somehow dropped 7 stitches (or cast on the wrong number) while knitting from ball band to the heel, so when I went to increase for the almost gusset... bad things happened. So it was promptly frogged. I've about 3 more rows where I need to pay attention and then it drops into a much less attention needing rib. Unless I decide to do the bottom in moss stitch for some extra cushioning? Not sure yet. This is definitely one of those pattern as a general guideline sort of deals.
Goals list: I went through and pruned and updated it. Every time I try to knit something for myself, it ends up getting turned into a gift anyway, so I just dropped most of the stuff I was doing for me. I might add a second shawl in, as I found a couple patterns that are making me go all lustful and stuff, but that's still a maybe. If I have time before Yule. At this point, as long as I have a new pair of gloves/mittens and a hat by winter, I'll be happy.
Life in general: It's not looking particularly optimistic for getting a new job. So I need to start looking for apartments. And clearing out our crap. If I get off early this afternoon, I should probably go find and apply for more jobs instead of playing with yarn.
Today is one of those days where you see why chemises, pettycoats and hairpins were invented. At least then I'd be comfortable in my look like hell status.